Line marking in Perth
Line marking Perth
Car parks, loading zones and warehouse floors, marked clearly. Tell us the surface, the area and the hours.
A good request
Tell us four things.
- The site and the suburb.
- The scope, in a few lines.
- The hours work can happen.
- Any tender closing date.
The work
Line marking in Perth.
New lines, repaints and layout changes. Bays, arrows, walkways, loading zones and accessible bays.
A car park often closes in parts while the paint dries. Plan the order of the work early.
Tell us the surface, the area and the hours the car park can close.
- Interior repaint
- Exterior repaint
- Roof painting
- Common property and stairwells
- Line marking
- Anti-graffiti coating
Who it is for
Built around the site.
Line marking
Car parks and floors, marked clearly.
Car parks, loading zones and warehouse floors. Tell us the surface, the area and if the car park can close. Say if the work must happen at night or at a weekend.
Tell us the jobWarehouses and industrial
Big roofs, high walls, working floors.
Warehouses, factories and yards. Height and access shape the job. Tell us the roof type, the wall height and when the floor is clear of forklifts and staff.
Tell us the jobProperty and facility managers
One request. The whole scope.
Tell us the site, the scope, the access and the hours the building is open. Say if tenants stay in during the work. Say if the site has its own induction or safety rules.
Send the scopePrice
What published guides say.
These ranges come from published cost guides. They are not a quote. A real price needs someone to see the site and the scope.
Send the scopePublished guide ranges
$25 to $50 per bay
Car park bay in paint, new set-out. Includes GST.
Source: What's The Damage?, Line Marking Cost Australia, Updated October 2026.
$15 to $45 per bay
Car park bay in paint, re-mark. Includes GST.
Source: What's The Damage?, Line Marking Cost Australia, Updated October 2026.
$4 to $20 per linear metre
Warehouse or factory floor line. Includes GST.
Source: What's The Damage?, Line Marking Cost Australia, Updated October 2026.
Before you send
What to put in your request.
The more you tell us, the clearer the scope. You can leave out what you do not know.
- The type of site, and the suburb.
- The trade, and what the work covers. Rooms, floors, walls, roof or square metres.
- Inside, outside or both.
- Access. Height, lifts, scaffolding and how to get on the roof.
- When the site is open, and when work can happen.
- If tenants, staff or customers stay in during the work.
- The date the work must be done by.
- If it is a tender, the closing date.
- Site rules, such as an induction or a SWMS for high risk work.
- If the building is from before 2004, say if it has an asbestos register.
- Any specification, colour schedule or drawings you have.
Start with the site
Tell us the job in Perth.
Plain questions, one at a time. The site and the scope first, your details last.
How it works
What happens to your request.
This site is in preview. Here is what happens to a request sent here today.
Tell us the job.
The site, the scope, the hours and any tender date.
We keep it.
Your request goes into a private store. Only House Proud Commercial can open it.
No business yet.
While we are in preview, we contact no business. Nobody else gets your details.
Questions
Good questions.
Can the work happen after hours or at weekends?
You can ask for it. Pick the hours in the form. Night and weekend work change the plan, so it helps to say early.
What is a SWMS, and when is one needed?
A SWMS is a safe work method statement. It is needed before high risk construction work starts. Work with a risk of a fall of more than 2 metres is one example. Ask to see it.
Who is responsible for safety when several businesses share a site?
Every state and territory has work health and safety laws, and Victoria has its own OHS laws. Businesses that share a duty must consult, co-operate and co-ordinate with each other.
Can one request cover several sites?
Yes. Pick multi-site in the form. List each site and its suburb in the scope.
Can I send a request for a tender?
Yes. Pick yes for tender and put the closing date in the scope. In preview, no business sees it yet.
Does an older building change the job?
It can. Asbestos has been banned in Australia since 31 December 2003, but older buildings may still contain it. If the site has an asbestos register, say so in the request.
Who sees my request?
Only House Proud Commercial. Your request goes into a private store. While we are in preview, no business gets it.
More requests